Precast segments for the Agrigento Caltanissetta tunnel

Project Details:

Client:
Empedocle 2 S.c.p.A

Completed in:
2014 - 2017

Construction system:
Infrastructure

Location:
SS 640, Agrigento – Caltanissetta

Surface area:
6.400 sqm

SICEP created for Empedocle 2 S.c.p.A., the precast concrete segments for the Caltanissetta tunnel as part of the adaptation works of SS 640, Agrigento – Caltanissetta itinerary:

  • 72 segments produced every day
  • 8 full rings per day
  • over 400M3 of concrete produced daily